Project

LEIXÕES PORT: ADVANCE OF ALL THE NORTH QUAY OF THE DOCK Nº 1

Category

Hydraulics & Maritime works

Client

APDL – Administração dos Portos de Douro, Leixões e Viana do Castelo, S.A.

Location

Leixões, Portugal

Services year

2020

share

LEIXÕES PORT: ADVANCE OF ALL THE NORTH QUAY OF THE DOCK Nº 1

Hydraulics & Maritime works

The Advanced Quay in Dock Nº 1 – North, with an approximate extension of 196 meters and built in 1973/74, recently entered a process of ruin, easily detectable by the sharp deformation of its crowning line, which has a maximum deflection of about 1 meter. This project foresees its complete demolition, replacing it with another quay, set back 7.50 m. At the same time, it is intended to widen the “mouth” of the adjacent Ro-Ro Ramp, to the East.

On the other hand, the Continuous Quay Wall in Dock N.º 1 - North, next to the Passenger Station, has an approximate extension of 290 meters and was dry built between 1932 and 1940, with depths of -10.00 m (CD). This project provides the construction of a new mooring structure advanced to the south of 7,50 m, in relation to its current alignment, prepared to be adapted in the future to depths of - 12,0 m (CD).

It is intended, with the realization of these two Detailed Designs simultaneously, with a single alignment of the north quay wall, the possibility of carrying out both interventions in the same Contract.

Provided services

Inspection of the emerged and submerged part of the structure; Preliminary Design and Detailed Design of the necessary interventions; Technical Tender Documents.